3 Key Efficiency Metrics for Enhanced Operations With Enverus PRISM® Activity Analytics

Adding confidence to efficiency metrics

byEnverus

Understanding the timing of each stage of preproduction, known as efficiency metrics, is imperative for having confidence in forecasting cycle times of operators and service companies. This helps ensure equipment is fully utilized and groups know what’s needed for each development phase.

To decipher efficiency metrics, it’s necessary to create a complete picture of what happens pre-production, including permits, pad construction, spud, rig release, DUC and turning-in-line first production.

Luckily, Enverus has made identifying these metrics easier than ever. Let’s take a look at three key efficiency metrics that can be identified using Enverus’ Activity Analytics within PRISM.

Conversion rates: Identify areas of growth

Conversion rate is a good key performance indicator (KPI) for permit as it helps identify areas where operators continue to invest by showing who follows through on drilling commitments. As we have seen in areas like the Delaware Basin, where regulatory environments can be in flux, operators may stock up on permits before administration changes. But those permits aren’t a true indication of planned activity. Being able to identify continued investment beyond the initial drilling permit instills confidence in which sites will be developed and where production will be coming from.

We can look at conversions, or the number of permits with detected pad construction. Evaluating conversions across basins helps decide if permits are good indicators for growth.

Permit numbers  can be a quick way to gauge changes in future activity. However, some basins are far from a reliable indicator. PRISM Activity Analytics makes it easy to see this KPI change. As illustrated in Figure 1, Marietta has an ideal conversion rate of 1-1. This instills more confidence in areas with high conversion rate, compared to San Juan or even parts of the Permian where permits are more speculative.

For drilling, we can add confidence to our analysis by detecting exactly when rigs move to the pad, based on proprietary GPS unit data. This gives us a better sense of the changing market share, who’s holding steady, declining or increasing.

Figure 1: Conversion rate for permitted pads to pad construction.

DUC inventory count: Indicator for future activity

As we consider outstanding investments in an area, DUC inventory is a key metric that offers insights on future activity levels. During the pandemic, we observed operators following through on drilling commitments and completing rig contracts, but not bringing frac crews on site to convert the DUCs.

Figure 2: Exxon Permian rigs through time.

For example, in Figure 2 and 3, we see Exxon maintaining their rig obligations in the Permian through the first portion of 2020, with an associated DUC build, but not bringing crews to continue work on those DUCs until much later.

Figure 3: Exxon Permian DUCs through time.

With PRISM, we can see frac crews arriving on site and determine how long the DUCs have been sitting to evaluate which is closest to development. Not all DUCs are created equal, so understanding which well will be prioritized allows for more competitive service bids, better volume predictions and more accurate understanding of oilfield activity.

Downtime: Improve planning and financial modeling

Understanding the typical duration for each instance of work and the downtime between development phases enables better planning and financial modeling. With Activity Analytics, we can evaluate efficiency at every stage, including KPIs for:

  • Permit to spud. Instead of taking a permit at face value, users can understand how immediately applicable a permit is to an operator’s development schedule, and how likely the permit is to be acted upon.
  • Spud to rig release. Given that not all drilling jobs require equal work, users can anticipate how long equipment will be needed on site, allowing for more competitive bid creation and higher win rates.
  • Completion to first production. Ideally, all available production will be turned in line as soon as possible. However, timing may be dependent on infrastructure constraints, weather conditions or lease conditions. Understanding the turnaround time from completion to TIL allows users to understand when volumes will enter gathering systems and impact prices, and when different equipment will be necessary.

Data for Lower 48 basins indicates that the overall efficiency timeline takes from a few months to more than a year, underscoring the need to get to know your operators’ behavior. PRISM also makes it easy to apply a cluster plot to any of these well stages to get a feel for how much we can trust the numbers.

Activity Analytics provides insight into each separate phase of development, from permit to production, and enables more specific business development, transparency into proposed schedules and enhanced equipment utilization. Without PRISM, teams are reliant solely upon reported data and quarterly updates.

Click here to learn more about how Activity Analytics can help you optimize the many stages of preproduction, and fill out the form below to speak with an Enverus expert.

Picture of Enverus

Enverus

Energy’s most trusted SaaS platform — creating intelligent connections that uncover insights and opportunities to deliver extraordinary outcomes.

Subscribe to the Enverus Blog

A weekly update on the latest “no-fluff” insight and analysis of the energy industry.

Related Content

energy-transition
Energy Transition
ByAlex Nevokshonoff, Enverus Intelligence® | Research (EIR) Contributor

We find that subsidized blue ammonia can reach the same production cost and even undercut gray ammonia costs, allowing it to be competitive in current fertilizer markets and for new decarbonization applications.

Enverus Press Release - The Barnett bonanza is coming
Blog Topics Minerals
ByPhillip Dunning

We’re on the brink of an exciting transition that promises to reshape the way you manage and understand your assets. Change often comes with a mix of emotions—curiosity and perhaps a bit of hesitation. Rest assured, we’re here to guide...

Enverus Press Release - Enverus Acquires BidOut, energy’s leading AI-powered procurement platform provider
Blog Topics Energy Analytics
ByBrandon Guttery

Introduction Operators and investors have been experiencing a mindset shift in the past few years, facing a unique challenge of balancing future inventory development and the need to maximize returns today. As Tier One plays are continuing to be developed,...

Enverus News Release - Defying peak oil predictions
Operators
ByMac Graham

It’s no secret that the oil and gas industry as a whole faces challenges in efficiently tracking and transferring materials for use in everyday operations. However, with advances in modern technology these processes are undergoing a remarkable transformation. Still, the...

Enverus Blog - Increase visibility and efficiency with OpenTicket Mobile digital field ticketing software
Operators
ByMac Graham

In the dynamic and demanding realm of the oil and gas sector, keeping spend under control and increasing capital efficiency continue to stand as pivotal challenges. Most E&P companies address these problems by trying to reign in spend, increase process...

Enverus Press Release - Enverus adds Energy Transition solutions around $3.5T/year sector
Power and Renewables
ByKevin Kang

Earlier this year, PJM’s forward price curve saw considerable volatility, primarily driven by increased speculation and optimism around the rapid growth of data centers. In January, prices spiked as market participants anticipated a sharp rise in electricity demand due to...

Enverus Press Release - Modeling EPA’s new Subpart W revision and the super-emitter wild card
Oilfield Services
ByJoseph Gyure, Editor, Enverus Intelligence

The U.S. composite day rate slipped just $2 lower in July to $22,921, according to the Enverus Day Rate Survey. While the miniscule decline was a dramatic change from June’s $308 plummet, an immediate recovery seems unlikely, as drillers surveyed...

Enverus News Release - EPA’s emission revision: More rules, double the methane, triple the tax
Energy Transition
BySmayan Sharma

Late last month, the DOE awarded its first tranches of funding for Phase 1 of the H2Hubs initiative, designed to reduce project planning costs. ARCHES, ARCH2 and PNWH2 received up to $90 million collectively, cutting their Phase 1 costs by 20%....

Enverus Blog
Power and Renewables
ByBen Rosen

For decades, ISO interconnection queues have managed the process of evaluating and approving power generation projects before they can connect to the power grid. In recent years, maintaining grid stability has become increasingly challenging due to various factors, including long...

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Sign up for our Blog

Register Today

Sign Up

Power Your Insights

Connect with an Expert

Access Product Tour

Speak to an Expert